当选金溜槽工作时,矿浆首先进入给矿槽,给矿槽的宽度与溜槽宽度相等,略低于溜槽床面,起到缓冲和分配矿浆的作用,避免矿浆直接冲击床面。矿浆进入溜槽后进行分选。溜格是由40*40角钢制成,上边焊接上50mm宽的钢板,并与水面呈0度夹角,可使在矿浆流动时产生很大涡流。上格板还加工有椭圆孔,相互交错排列,主要作用是使板下部分沉积层中的轻矿物在鼓动作用下从孔中排出,椭圆孔前部设有挡铁,防止粗砾石堵塞椭圆孔。
Elected gold chute, pulp first into the feed chute, chute and the width of the chute width equal to, slightly lower than the chute bed surface, play a role in buffering and distribution of slurry, avoid pulp have a direct impact on the bed. The pulp into the chute for separation. A sliding lattice is made of 40 * 40 angle, the upper welding 50mm wide plate, and with the surface of the water is 0 degree angle, can produce the large eddy in the pulp flow. On the grid plate is processed with an elliptical hole, mutually staggered arrangement, the main role is to plate deposition layer of the light minerals in encouraging from the hole discharge, elliptic hole before a stop to prevent coarse gravel blockage of elliptical hole.
|